Property sales and transfers

What Happens If a Property Fails an Electrical CoC Inspection?

Understand defect reports, repair quotes, urgent hazards, re-testing and when a registered person can issue the electrical CoC.

Written by
Welvaart Electrical, Registered electrical contractor
Last reviewed
1 August 2026

QUICK ANSWER

A property has not “failed forever”. The inspection found one or more issues that prevent the registered person from issuing the CoC at that point. The usual path is: understand the findings, deal with immediate hazards, approve the repair scope, rectify the defects, re-test the affected installation and issue only once it complies.

What “failed” really means

Consumers often hear that a house has “failed its CoC”. In practical terms, the registered person found a fault or defect during inspection or testing and therefore cannot issue the certificate. The Electrical Installation Regulations require refusal until the problem has been rectified. An immediate danger may require disconnection of the dangerous part and formal notice.

A defect report should help you move from uncertainty to a defined scope. It should not be used to frighten you into approving unrelated work. Ask for each material finding to be explained in plain language and connected to the compliance or safety reason.

The normal route from findings to certificate

Receive the findings or defect list and confirm which installation and buildings were inspected.

Ask which items present an immediate danger, which block certification, and which are optional recommendations.

Request a written repair scope with exclusions, assumptions and VAT treatment.

Approve the work you understand. If appropriate, obtain another quote without asking anyone to overlook real defects.

Have the defects rectified by competent people and keep evidence of the work.

Arrange re-testing or re-inspection. Repair work alone does not automatically prove compliance.

Once the registered person is satisfied, obtain the signed CoC and test report and store both.

Already have a defect report? Send the information when requesting a visit so the electrician can understand the property, access needs and likely scope before attending. REQUEST A FOLLOW-UP

How to read a defect report without panic

Finding typeWhat it means for youUseful question to ask
Immediate dangerPeople or property may be exposed to serious risk; the dangerous part may need urgent isolation or disconnection.What must stop being used now, and what is the safe next step?
Compliance-blocking defectThe certificate cannot be issued until this item is rectified and tested.Which requirement is relevant, and what repair outcome is needed?
Access or testing limitationThe inspector could not safely access or complete a necessary check.What access, shutdown or specialist involvement is required?
Recommended improvementUseful work that may not be the reason the certificate is withheld.Is this required for certification, a safety recommendation, or optional future work?

Common findings in South African properties

Every property is different, and a web article cannot diagnose yours. However, inspection findings often involve earthing or bonding, damaged accessories, exposed conductors, unsuitable connections, missing identification, protection that does not operate as required, poor work from earlier alterations, or circuits and equipment that cannot be tested safely.

Older does not automatically mean unsafe, and “not the newest appearance” does not automatically mean a failure. The applicable requirements, the installation history and the measured condition all matter. Ask the registered person to distinguish an actual defect from a cosmetic preference or optional modernisation.

What if the problems came from an earlier renovation?

Unrecorded work often becomes visible when the property is sold or upgraded. New plugs, a kitchen change, an outbuilding, gate motor, pool equipment, solar or a replacement DB board may have been added without the documents being kept. The practical response is to assess the current installation and record trail, not to assume that the presence of an old certificate automatically covers later work.

Can you use a different electrician for the repairs?

You may ask for another repair quote, but roles must remain clear. The registered person who signs takes responsibility for being satisfied with the inspection and testing required before issue. If another contractor performs repairs, the issuing person may need evidence and may repeat tests or checks rather than accepting the work at face value.

Before splitting the work, ask how re-testing, responsibility, access and additional fees will be handled. A slightly lower repair price can become false economy if the scope is incomplete or the issuing process has to start again.

How repair quotes should be presented

  • The exact property and installation areas included.
  • Each material repair item, with a short reason.
  • What is excluded or cannot be priced until access is available.
  • Whether VAT, materials, labour, travel, re-testing and certification are included.
  • How additional defects discovered during opened-up work will be approved.
  • Whether optional upgrade work is separated from mandatory rectification.
  • The expected document handover after successful testing.

DO NOT “FIX” PROTECTION

Never bypass earth leakage, fit a larger breaker as a shortcut, bridge a safety device or repeatedly force a tripping circuit back on. A protective device that operates is warning you that investigation is needed.

When cost becomes difficult to predict

An inspection fee can be fixed more easily than repair work because repair scope depends on what is found. Concealed cable routes, inaccessible ceilings, undocumented additions, multiple outbuildings, three-phase equipment and damaged circuits can change labour and materials. Transparent pricing means explaining those variables—not pretending that every property will cost the same.

Ask for staged approval if the installation is complex: urgent safety work first, defined compliance repairs next, and optional upgrades separately. That gives the owner better control without asking the contractor to certify unfinished work.

Common questions

Can a registered person issue the certificate and list repairs for later?
Not when a detected fault or defect prevents compliance. The regulations require refusal until rectification.
Does every old component have to be replaced?
Not merely because it is old. Its condition, safety, compatibility and the applicable requirements matter. Ask for the reason each replacement is proposed.
Can I get a second opinion?
Yes, especially for a large scope. Give the second professional the full context and do not ask them to disregard genuine hazards.
Will the first inspection fee include all repairs?
Usually those are different scopes. Confirm exactly what the published or quoted fee includes and whether re-testing is separate.
How long will rectification take?
It depends on the defects, access, materials, shutdown needs and re-testing. Obtain a property-specific programme rather than relying on a generic promise.

Turn the defect list into a clear plan Request an assessment or send the report details. Welvaart can explain the likely next step and quote repairs separately.

Request a CoC inspection

Sources and publication notes

Sources and further reading

  • Electrical Installation Regulations, 2009 (regulations 7 and 9)
  • Department of Employment and Labour: electrical compliance laws
  • Department warning about unregistered electrical contractors

This guide is general information about electrical compliance in South Africa. It is not legal advice and does not replace an inspection of your specific installation.

Request a CoC inspection

Ready to arrange your CoC inspection?

Send your details and we confirm the fee and an available time. No repair work happens without your approval.